Tuesday, October 26, 2010

Manual Testing : WBT&BBT

------------------------------------------------------------------
4. When should Testing stop?
"When to stop testing" is one of the most difficult questions to a test engineer.
The following are few of the common Test Stop criteria:
1. All the high priority bugs are fixed.
2. The rate at which bugs are found is too small.
3. The testing budget is exhausted.
4. The project duration is completed.
5. The risk in the project is under acceptable limit.
5. Verification Strategies
5.1.What is ‘Verification’?
"Am I building the product right?" Verification is the process of evaluating a system or component to determine whether the products of a given development phase satisfy the conditions imposed at the start of that phase.
What is the importance of the Verification Phase?
Verification process helps in detecting defects early, and preventing their leakage downstream. Thus, the higher cost of later detection and rework is eliminated.
5.1.1 Review
A process or meeting during which a work product, or set of work products, is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
The main goal of reviews is to find defects. Reviews are a good compliment to testing to help assure quality. A few purposes’ of SQA reviews can be as follows:
• Assure the quality of deliverable’s before the project moves to the next stage.
• Once a deliverable has been reviewed, revised as required, and approved, it can be used as a basis for the next stage in the life cycle.
5.1.2.What are the various types of reviews?
Types of reviews include Management Reviews, Technical Reviews, Inspections, Walkthroughs and Audits.
Management Reviews
Management reviews are performed by those directly responsible for the system in order to monitor progress, determine status of plans and schedules, confirm requirements and their system allocation.
Therefore the main objectives of Management Reviews can be categorized as follows:
• Validate from a management perspective that the project is making progress according to the project plan.
• Ensure that deliverables are ready for management approvals.
• Resolve issues that require management’s attention.
• Identify any project bottlenecks.
• Keeping project in Control.
The participants of the review play the roles of Decision-Maker, Review Leader, Recorder, Management Staff, and Technical Staff.
Technical Reviews
Technical reviews confirm that product Conforms to specifications, adheres to regulations, standards, guidelines, plans, changes are properly implemented, changes affect only those system areas identified by the change specification.
The main objectives of Technical Reviews can be categorized as follows:
• Ensure that the software confirms to the organization standards.
• Ensure that any changes in the development procedures (design, coding, testing) are implemented per the organization pre-defined standards.
In technical reviews, the following Software products are reviewed
• Software requirements specification
• Software design description
• Software test documentation
• Software user documentation
• Installation procedure
• Release notes
The participants of the review play the roles of Decision-maker, Review leader, Recorder, Technical staff.
What is Requirement Review?
A process or meeting during which the requirements for a system, hardware item, or software item are presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include system requirements review, software requirements review.
• Product management leads Requirement Review. Members from every affected department participates in the review
What is Design Review?
A process or meeting during which a system, hardware, or software design is presented to project personnel, managers, users, customers, or other interested parties for comment or approval. Types include critical design review, preliminary design review, and system design review.
• QA team member leads design review. Members from development team and QA team participate in the review.
What is Code Review?
A meeting at which software code is presented to project personnel, managers, users, customers, or other interested parties for comment or approval.
• QA team member (In case the QA Team is only involved in Black Box Testing, then the Development team lead chairs the review team) leads code review. Members from development team and QA team participate in the review.
5.2 Walkthrough
A static analysis technique in which a designer or programmer leads members of the development team and other interested parties through a segment of documentation or code, and the participants ask questions and make comments about possible errors, violation of development standards, and other problems.
The objectives of Walkthrough can be summarized as follows:
• Detect errors early.
• Ensure (re)established standards are followed:
• Train and exchange technical information among project teams which participate in the walkthrough.
• Increase the quality of the project, thereby improving morale of the team members.
The participants in Walkthroughs assume one or more of the following roles:
a) Walk-through leader
b) Recorder
c) Author
d) Team member
Input to the walk-through shall include the following:
a) A statement of objectives for the walk-through
b) The software product being examined
c) Standards that are in effect for the acquisition, supply, development, operation, and/or maintenance of the software product
Input to the walk-through may also include the following:
5.3 Inspection
A static analysis technique that relies on visual examination of development products to detect errors, violations of development standards, and other problems. Types include code inspection; design inspection, Architectural inspections, Test ware inspections etc.
The participants in Inspections assume one or more of the following roles:
a) Inspection leader
b) Recorder
c) Reader
d) Author
e) Inspector

All participants in the review are inspectors. The author shall not act as inspection leader and should not act as reader or recorder. Other roles may be shared among the team members. Individual participants may act in more than one role.
Input to the inspection shall include the following:
a) A statement of objectives for the inspection
b) The software product to be inspected
c) Documented inspection procedure
d) Inspection reporting forms
e) Current anomalies or issues list
Input to the inspection may also include the following:
f) Inspection checklists
g) Any regulations, standards, guidelines, plans, and procedures against which the software product is to be inspected

6.Testing Types and Techniques
Testing types
Testing types refer to different approaches towards testing a computer program, system or product. The two types of testing are black box testing and white box testing, which would both be discussed in detail in this chapter. Another type, termed as gray box testing or hybrid testing is evolving presently and it combines the features of the two types.
Testing Techniques
Testing techniques refer to different methods of testing particular features a computer program, system or product. Each testing type has its own testing techniques while some techniques combine the feature of both types. Some techniques are
• Error and anomaly detection technique
• Interface checking
• Physical units checking
• Loop testing ( Discussed in detail in this chapter)
• Basis Path testing/McCabe’s cyclomatic number( Discussed in detail in this chapter)
• Control structure testing( Discussed in detail in this chapter)
• Error Guessing( Discussed in detail in this chapter)
• Boundary Value analysis ( Discussed in detail in this chapter)
• Graph based testing( Discussed in detail in this chapter)
• Equivalence partitioning( Discussed in detail in this chapter)
• Instrumentation based testing
• Random testing
• Domain testing
Difference between Testing Types and Testing Techniques
Testing types deal with what aspect of the computer software would be tested, while testing techniques deal with how a specific part of the software would be tested.
That is, testing types mean whether we are testing the function or the structure of the software. In other words, we may test each function of the software to see if it is operational or we may test the internal components of the software to check if its internal workings are according to specification.
On the other hand, ‘Testing technique’ means what methods or ways would be applied or calculations would be done to test a particular feature of a software (Sometimes we test the interfaces, sometimes we test the segments, sometimes loops etc.)
How to Choose a Black Box or White Box Test?
White box testing is concerned only with testing the software product; it cannot guarantee that the complete specification has been implemented. Black box testing is concerned only with testing the specification; it cannot guarantee that all parts of the implementation have been tested. Thus black box testing is testing against the specification and will discover faults of omission, indicating that part of the specification has not been fulfilled. White box testing is testing against the implementation and will discover faults of commission, indicating that part of the implementation is faulty. In order to completely test a software product both black and white box testing are required.
White box testing is much more expensive (In terms of resources and time) than black box testing. It requires the source code to be produced before the tests can be planned and is much more laborious in the determination of suitable input data and the determination if the software is or is not correct. It is advised to start test planning with a black box testing approach as soon as the specification is available. White box tests are to be planned as soon as the Low Level Design (LLD) is complete. The Low Level Design will address all the algorithms and coding style. The paths should then be checked against the black box test plan and any additional required test cases should be determined and applied.

7.1 White Box Testing
What is WBT?
White box testing involves looking at the structure of the code. When you know the internal structure of a product, tests can be conducted to ensure that the internal operations performed according to the specification. And all internal components have been adequately exercised. In other word WBT tends to involve the coverage of the specification in the code.
Code coverage is defined in six types as listed below.
• Segment coverage – Each segment of code b/w control structure is executed at least once.
• Branch Coverage or Node Testing – Each branch in the code is taken in each possible direction at least once.
• Compound Condition Coverage – When there are multiple conditions, you must test not only each direction but also each possible combinations of conditions, which is usually done by using a ‘Truth Table’
• Basis Path Testing – Each independent path through the code is taken in a pre-determined order. This point will further be discussed in other section.
• Data Flow Testing (DFT) – In this approach you track the specific variables through each possible calculation, thus defining the set of intermediate paths through the code i.e., those based on each piece of code chosen to be tracked. Even though the paths are considered independent, dependencies across multiple paths are not really tested for by this approach. DFT tends to reflect dependencies but it is mainly through sequences of data manipulation. This approach tends to uncover bugs like variables used but not initialize, or declared but not used, and so on.
• Path Testing – Path testing is where all possible paths through the code are defined and covered. This testing is extremely laborious and time consuming.
• Loop Testing – In addition top above measures, there are testing strategies based on loop testing. These strategies relate to testing single loops, concatenated loops, and nested loops. Loops are fairly simple to test unless dependencies exist among the loop or b/w a loop and the code it contains.
What do we do in WBT?
In WBT, we use the control structure of the procedural design to derive test cases. Using WBT methods a tester can derive the test cases that
• Guarantee that all independent paths within a module have been exercised at least once.
• Exercise all logical decisions on their true and false values.
• Execute all loops at their boundaries and within their operational bounds
• Exercise internal data structures to ensure their validity.
White box testing (WBT) is also called Structural or Glass box testing.

Limitations
1.Unfortunately in WBT, exhaustive testing of a code presents certain logistical problems. Even for small programs, the number of possible logical paths can be very large.
2. Exhaustive WBT is impossible for large software systems. But that doesn’t mean WBT should be considered as impractical. Limited WBT in which a limited no. of important logical paths are selected and exercised and important data structures are probed for validity, is both practical and WBT.
It is suggested that white and black box testing techniques can be coupled to provide an approach that that validates the software interface selectively ensuring the correction of internal working of the software.

7.1.1 Basis Path Testing
The Basis path method enables to derive a logical complexity measure of a procedural design and use this measure as a guide for defining a basis set of execution paths. Test Cases derived to exercise the basis set are guaranteed to execute every statement in the program at least one time during testing.
7.1.2 Flow Graph Notation
The flow graph depicts logical control flow using a diagrammatic notation. Each structured construct has a corresponding flow graph symbol.
7.1.3 Cyclomatic Complexity
Cyclomatic complexity is a software metric that provides a quantitative measure of the logical complexity of a program. When used in the context of a basis path testing method, the value computed for Cyclomatic complexity defines the number for independent paths in the basis set of a program and provides us an upper bound for the number of tests that must be conducted to ensure that all statements have been executed at least once.
An independent path is any path through the program that introduces at least one new set of processing statements or a new condition.
Computing Cyclomatic Complexity
Cyclomatic complexity has a foundation in graph theory and provides us with extremely useful software metric. Complexity is computed in one of the three ways:
1. The number of regions of the flow graph corresponds to the Cyclomatic complexity.
2. Cyclomatic complexity, V(G), for a flow graph, G is defined as
V (G) = E-N+2
Where E, is the number of flow graph edges, N is the number of flow graph nodes.
3. Cyclomatic complexity, V (G) for a flow graph, G is also defined as:
V (G) = P+1
Where P is the number of predicate nodes contained in the flow graph G.
7.1.4 Graph Matrices
The procedure for deriving the flow graph and even determining a set of basis paths is amenable to mechanization. To develop a software tool that assists in basis path testing, a data structure, called a graph matrix can be quite useful.
A Graph Matrix is a square matrix whose size is equal to the number of nodes on the flow graph. Each row and column corresponds to an identified node, and matrix entries correspond to connections between nodes.
7.1.5 Control Structure Testing
Described below are some of the variations of Control Structure Testing.
Condition Testing
Condition testing is a test case design method that exercises the logical conditions contained in a program module.
Data Flow Testing
The data flow testing method selects test paths of a program according to the locations of definitions and uses of variables in the program.
7.1.6 Loop Testing
Loop Testing is a white box testing technique that focuses exclusively on the validity of loop constructs. Four classes of loops can be defined: Simple loops, Concatenated loops, nested loops, and unstructured loops.
Simple Loops
The following sets of tests can be applied to simple loops, where ‘n’ is the maximum number of allowable passes through the loop.
1. Skip the loop entirely.
2. Only one pass through the loop.
3. Two passes through the loop.
4. ‘m’ passes through the loop where m
5. n-1, n, n+1 passes through the loop.
Nested Loops
If we extend the test approach from simple loops to nested loops, the number of possible tests would grow geometrically as the level of nesting increases.
1. Start at the innermost loop. Set all other loops to minimum values.
2. Conduct simple loop tests for the innermost loop while holding the outer loops at their minimum iteration parameter values. Add other tests for out-of-range or exclude values.
3. Work outward, conducting tests for the next loop, but keep all other outer loops at minimum values and other nested loops to “typical” values.
4. Continue until all loops have been tested.
Concatenated Loops
Concatenated loops can be tested using the approach defined for simple loops, if each of the loops is independent of the other. However, if two loops are concatenated and the loop counter for loop 1 is used as the initial value for loop 2, then the loops are not independent.
Unstructured Loops
Whenever possible, this class of loops should be redesigned to reflect the use of the structured programming constructs.
8. Black Box Testing
Black box is a test design method. Black box testing treats the system as a "black-box", so it doesn't explicitly use Knowledge of the internal structure. Or in other words the Test engineer need not know the internal working of the “Black box”.
It focuses on the functionality part of the module.
Some people like to call black box testing as behavioral, functional, opaque-box, and closed-box.
Advantages of Black Box Testing
- Tester can be non-technical.
- This testing is most likely to find those bugs as the user would find.
- Testing helps to identify the vagueness and contradiction in functional specifications.
- Test cases can be designed as soon as the functional specifications are complete
Disadvantages of Black Box Testing
- Chances of having repetition of tests that are already done by programmer.
- The test inputs needs to be from large sample space.
- It is difficult to identify all possible inputs in limited testing time. So writing test cases is slow and difficult
Chances of having unidentified paths during this testing
8.2.1 Graph Based Testing Methods
Software testing begins by creating a graph of important objects and their relationships and then devising a series of tests that will cover the graph so that each objects and their relationships and then devising a series of tests that will cover the graph so that each object and relationship is exercised and error is uncovered.
8.2.2 Error Guessing
Error Guessing comes with experience with the technology and the project. Error Guessing is the art of guessing where errors can be hidden. There are no specific tools and techniques for this, but you can write test cases depending on the situation: Either when reading the functional documents or when you are testing and find an error that you have not documented.
8.2.3 Boundary Value Analysis
Boundary Value Analysis (BVA) is a test data selection technique (Functional Testing technique) where the extreme values are chosen. Boundary values include maximum, minimum, just inside/outside boundaries, typical values, and error values. The hope is that, if a system works correctly for these special values then it will work correctly for all values in between.
Extends equivalence partitioning
Test both sides of each boundary
Look at output boundaries for test cases too  Test min, min-1, max, max+1, typical values
BVA focuses on the boundary of the input space to identify test cases
Rational is that errors tend to occur near the extreme values of an input variable
There are two ways to generalize the BVA techniques:
1. By the number of variables
o For n variables: BVA yields 4n + 1 test cases.
2. By the kinds of ranges
o Generalizing ranges depends on the nature or type of variables
NextDate has a variable Month and the range could be defined as {Jan, Feb, …Dec}
Min = Jan, Min +1 = Feb, etc.
Triangle had a declared range of {1, 20,000}
Boolean variables have extreme values True and False but there is no clear choice for the remaining three values
Advantages of Boundary Value Analysis
1.Robustness Testing - Boundary Value Analysis plus values that go beyond the limits
2.Min - 1, Min, Min +1, Nom, Max -1, Max, Max +1
3.Forces attention to exception handling
4.For strongly typed languages robust testing results in run-time errors that abort normal execution
Limitations of Boundary Value Analysis
BVA works best when the program is a function of several independent variables that represent bounded physical quantities
1. Independent Variables
o NextDate test cases derived from BVA would be inadequate: focusing on the boundary would not leave emphasis on February or leap years
o Dependencies exist with NextDate's Day, Month and Year
o Test cases derived without consideration of the function
2. Physical Quantities
o An example of physical variables being tested, telephone numbers - what faults might be revealed by numbers of 000-0000, 000-0001, 555-5555, 999-9998, 999-9999?
8.2.4 Equivalence Partitioning
Equivalence partitioning is a black box testing method that divides the input domain of a program into classes of data from which test cases can be derived.
EP can be defined according to the following guidelines:
1. If an input condition specifies a range, one valid and one two invalid classes are defined.
2. If an input condition requires a specific value, one valid and two invalid equivalence classes are defined.
3. If an input condition specifies a member of a set, one valid and one invalid equivalence class is defined.
4. If an input condition is Boolean, one valid and one invalid class is defined.
8.2.5 Comparison Testing
There are situations where independent versions of software be developed for critical applications, even when only a single version will be used in the delivered computer based system. It is these independent versions which form the basis of a black box testing technique called Comparison testing or back-to-back testing.
8.2.6 Orthogonal Array Testing
The Orthogonal Array Testing Strategy (OATS) is a systematic, statistical way of testing pair-wise interactions by deriving a suitable small set of test cases (from a large number of possibilities).

Manual Testing:Fundamental Of Testing

1. What is Software Testing and Why is it Important?
Defect can be caused by a flaw in the application software or by a flaw in the application specification. For example, unexpected (incorrect) results can be from errors made during the construction phase, or from an algorithm incorrectly defined in the specification. Testing is commonly assumed to mean executing software and finding errors. This type of testing is known as dynamic testing, and while valid, it is not the most effective way of testing. Static testing, the review, inspection and validation of development requirements, is the most effective and cost efficient way of testing. A structured approach to testing should use both dynamic and static.
Testing techniques:
1.Subjective Testing
Subjective testing mainly depends on an expert's opinion. An expert is a person who is proficient and experienced in the system under test. Conducting the test involves test runs of the simulation by the expert and then the expert evaluates and validates the results based on some criteria.
One advantage of this approach over objective testing is that it can test those conditions which cannot be tested objectively. For example, an expert can determine whether the joystick handling of the flight feels "right".
One disadvantage is that the evaluation of the system is based on the "expert's" opinion, which may differ from expert to expert. Also, if the system is very large then it is bound to have many experts. Each expert may view it differently and can give conflicting opinions. This makes it difficult to determine the validity of the system. Despite all these disadvantages, subjective testing is necessary for testing systems with human interaction.
2.Objective Testing :
Objective testing is mainly used in systems where the data can be recorded while the simulation is running. This testing technique relies on the application of statistical and automated methods to the data collected.
Statistical methods are used to provide an insight into the accuracy of the simulation. These methods include hypothesis testing, data plots, principle component analysis and cluster analysis.
Automated testing requires a knowledge base of valid outcomes for various runs of simulation. This knowledge base is created by domain experts of the simulation system being tested. The data collected in various test runs is compared against this knowledge base to automatically validate the system under test. An advantage of this kind of testing is that the system can continually be regression tested as it is being developed.
2. Heuristics of Software Testing
(a):Testability
Software testability is how easily, completely and conveniently a computer program can be tested.
Software engineers design a computer product, system or program keeping in mind the product testability. Good programmers are willing to do things that will help the testing process and a checklist of possible design points, features and so on can be useful in negotiating with them.
Here are the two main heuristics of software testing.
1. Visibility
2. Control
Visibility is our ability to observe the states and outputs of the software under test. Features to improve the visibility are
• Access to Code
• Event logging
• Error detection mechanisms
• Resource Monitoring
Categories of Heuristics of software testing
• Operability
The better it works, the more efficiently it can be tested.The system should have few bugs, no bugs should block the execution of tests and the product should evolve in functional stages (simultaneous development and testing).
• Observability
What we see is what we test.
 Distinct output should be generated for each input
 Current and past system states and variables should be visible during testing
 All factors affecting the output should be visible.
 Incorrect output should be easily identified.
 Source code should be easily accessible.
• Controllability
The better we control the software, the more the testing process can be automated and optimized.
Check that
 All outputs can be generated and code can be executed through some combination of input.
 Software and hardware states can be controlled directly by the test engineer.
 Inputs and output formats are consistent and structured.
 Test can be conveniently, specified, automated and reproduced.
• Decomposability
By controlling the scope of testing, we can quickly isolate problems and perform effective and efficient testing.
• Simplicity
The less there is to test, the more quickly we can test it.
The points to consider in this regard are functional (e.g. minimum set of features), structural (e.g. architecture is modularized) and code (e.g. a coding standard is adopted) simplicity.
• Stability
The fewer the changes, the fewer are the disruptions to testing.The changes to software should be infrequent, controlled and not invalidating existing tests. The software should be able to recover well from failures.
• Understandability
The more information we will have, the smarter we will test.The testers should be able to understand well the design, changes to the design and the dependencies between internal, external and shared components.
Technical documentation should be instantly accessible, accurate, well organized, specific and detailed.
• Suitability
The more we know about the intended use of the software, the better we can organize our testing to find important bugs.

3. When Testing should occur?
Wrong Assumption
Testing is sometimes incorrectly thought as an after-the-fact activity; performed after programming is done for a product. Instead, testing should be performed at every development stage of the product .Test data sets must be derived and their correctness and consistency should be monitored throughout the development process. If we divide the lifecycle of software development into “Requirements Analysis”, “Design”, “Programming/Construction” and “Operation and Maintenance”, then testing should accompany each of the above phases. If testing is isolated as a single phase late in the cycle, errors in the problem statement or design may incur exorbitant costs. Not only must the original error be corrected, but the entire structure built upon it must also be changed. Therefore, testing should not be isolated as an inspection activity. Rather testing should be involved throughout the SDLC in order to bring out a quality product.

Testing Activities in Each Phase
The following testing activities should be performed during the phases
• Requirements Analysis - (1) Determine correctness (2) Generate functional test data.
• Design - (1) Determine correctness and consistency (2) Generate structural and functional test data.
• Programming/Construction - (1) Determine correctness and consistency (2) Generate structural and functional test data (3) Apply test data (4) Refine test data.
• Operation and Maintenance - (1) Retest.

Now we consider these in detail.
Requirements Analysis
The following test activities should be performed during this stage.
• Invest in analysis at the beginning of the project - Having a clear, concise and formal statement of the requirements facilitates programming, communication, error analysis an d test data generation.
The requirements statement should record the following information and decisions:
1. Program function - What the program must do?
2. The form, format, data types and units for input.
3. The form, format, data types and units for output.
4. How exceptions, errors and deviations are to be handled.
5. For scientific computations, the numerical method or at least the required accuracy of the solution.
6. The hardware/software environment required or assumed (e.g. the machine, the operating system, and the implementation language).

Deciding the above issues is one of the activities related to testing that should be performed during this stage.
• Start developing the test set at the requirements analysis phase - Data should be generated that can be used to determine whether the requirements have been met. To do this, the input domain should be partitioned into classes of values that the program will treat in a similar manner and for each class a representative element should be included in the test data. In addition, following should also be included in the data set: (1) boundary values (2) any non-extreme input values that would require special handling.
The output domain should be treated similarly.Invalid input requires the same analysis as valid input.
• The correctness, consistency and completeness of the requirements should also be analyzed - Consider whether the correct problem is being solved, check for conflicts and inconsistencies among the requirements and consider the possibility of missing cases.

Design
The design document aids in programming, communication, and error analysis and test data generation. The requirements statement and the design document should together give the problem and the organization of the solution i.e. what the program will do and how it will be done.
The design document should contain:
• Principal data structures.
• Functions, algorithms, heuristics or special techniques used for processing.
• The program organization, how it will be modularized and categorized into external and internal interfaces.
• Any additional information.

Here the testing activities should consist of:
• Analysis of design to check its completeness and consistency - the total process should be analyzed to determine that no steps or special cases have been overlooked. Internal interfaces, I/O handling and data structures should specially be checked for inconsistencies.

• Analysis of design to check whether it satisfies the requirements - check whether both requirements and design document contain the same form, format, units used for input and output and also that all functions listed in the requirement document have been included in the design document. Selected test data which is generated during the requirements analysis phase should be manually simulated to determine whether the design will yield the expected values.

• Generation of test data based on the design - The tests generated should cover the structure as well as the internal functions of the design like the data structures, algorithm, functions, heuristics and general program structure etc. Standard extreme and special values should be included and expected output should be recorded in the test data.
Programming/Construction
Here the main testing points are:
• Check the code for consistency with design - the areas to check include modular structure, module interfaces, data structures, functions, algorithms and I/O handling.
• Perform the Testing process in an organized and systematic manner with test runs dated, annotated and saved. A plan or schedule can be used as a checklist to help the programmer organize testing efforts.
• Use available tools - the programmer should be familiar with various compilers and interpreters available on the system for the implementation language being used because they differ in their error analysis and code generation capabilities.
• Apply Stress to the Program - Testing should exercise and stress the program structure, the data structures, the internal functions and the externally visible functions or functionality. Both valid and invalid data should be included in the test set.
• Test one at a time - Pieces of code, individual modules and small collections of modules should be exercised separately before they are integrated into the total program, one by one. Errors are easier to isolate when the no. of potential interactions should be kept small. Instrumentation-insertion of some code into the program solely to measure various program characteristics – can be useful here. A tester should perform array bound checks, check loop control variables, determine whether key data values are within permissible ranges, trace program execution, and count the no. of times a group of statements is executed.
Operations and maintenance
Corrections, modifications and extensions are bound to occur even for small programs and testing is required every time there is a change. Testing during maintenance is termed regression testing. The test set, the test plan, and the test results for the original program should exist. Modifications must be made to accommodate the program changes, and then all portions of the program affected by the modifications must be re-tested. After regression testing is complete, the program and test documentation must be updated to reflect the changes.